Ealing, W5
Project Brief: Provide new utility connections and build a split level detached house on a constrained backland site for developer client.
Build Duration: 46 weeks
Contract: FMB (Federation of Master Builders)
BWC Comment: The completed house was featured on BBC 1 TV for its clever design and build quality